About 4,380,000 results
Open links in new tab
  1. Log into Built, request funds on the project and the draw request will be initiated. You will be able to include files, receipts, and documents as well as leave comments for the lending institution, …

  2. What does ‘draw’ mean in built? Built defines a draw as all the actions or steps that it takes for you to get funded, including requesting an inspection, getting borrower authorization (if …

  3. Exploring the Hidden Science of Modern Engineering Marvels. In "Built," Roma Agrawal, the engineer behind the iconic Shard, reveals the remarkable science that underpins the …

  4. The as-built riser diagrams are an official record of the project at the time of construction completion and must be submitted to the Fire Alarm Inspection Unit.

  5. When preparing an as-built for an older BMP for which the original design information and/or construction inspection records are not available, do not hesitate to contact the Plan Review …

  6. Both the original design and constructed condition must be clearly shown. The plans need to be clearly labeled as "as-built" or "record" drawings that clearly highlight (such as through “red …

  7. After the native CADD file has been revised to reflect as-built conditions, provide a PDF version for submittal with the Final As-Built Plans.